
Some of Our Project Experience :
-
Supply of manpower for Laying 18” Export Pipeline at Arwana Barge, Amerada Hess Project
-
Fabrication Piles & Stabbing Guide SN 1/EPCS 1 Sisinubi Total Indonesie
-
Sub contractor of Pre-fabrication Assy & Erection Deck VR-B BP Tangguh – 6 Legs
-
Fabrication, Assembly, Erection & Loud Out Guardian Sleeve Jacket KE-32, Kodeco Project
-
Fabrication Pressure Vessel (Deaerator) & Hot Well Condenser – Alstom Project
-
Piping Installation Onshore Gas Processing Facilities Oyong Phase II – Santos Project
| Latest projects |
|
Urawa Scope of work are : Sub Cellar and Cellar Deck Extension Installation, Monorail Framing Installation, Crane Boom Rest installation, Crane Access Platform & Crane Pedestal Installation, Modification and Strengthening Existing Platform, Chemical injection skid Installation, Pipe Support Installation, installation of Carbon steel Pipe (B01B, B09D, A01A), Installation of galvanized pipe (G01N).
Installation Work for Onshore Santos Oyong Development Project Phase II Gas Processing Package at Grati-Pasuruan.
Urawa Rekayasa Mandiri has been completed completed Oyong Oyong Onshore Development Project Phase II Development Project Phase II Onshore Processing Facility (OPF), together along with the PT. PAL & PECTECH. PT. PAL & PECTECH. Urawa Scope of work are : Civil Work, Piping Installation, Mechanical, Electrical and Instrument Installation. |





