Some of Our Project Experience :
-
Supply of manpower for Laying 18” Export Pipeline at Arwana Barge, Amerada Hess Project
-
Fabrication Piles & Stabbing Guide SN 1/EPCS 1 Sisinubi Total Indonesie
-
Sub contractor of Pre-fabrication Assy & Erection Deck VR-B BP Tangguh – 6 Legs
-
Fabrication, Assembly, Erection & Loud Out Guardian Sleeve Jacket KE-32, Kodeco Project
-
Fabrication Pressure Vessel (Deaerator) & Hot Well Condenser – Alstom Project
-
Piping Installation Onshore Gas Processing Facilities Oyong Phase II – Santos Project